|
|
SEACOOS Fall 2005 Workshop
The SEACOOS Fall 2005 Workshop, November 15-16 at the Columbia Marriott in Columbia, SC, will be an internal SEACOOS gathering of working groups. All PIs and individuals working on projects outlined in the Year 4 proposal are requested to register and attend. Affiliate members are welcomed to send one representative. There is no registration fee for this workshop. Please contact Alison Blaine for more information: ablaine(at)email(dot)unc(dot)edu, 919-962-1252. See also the "Related Meetings" link below for other meetings occuring in conjunction with this workshop.
|
|
This agenda may be downloaded as an Adobe PDF or a Word Document.
AIMS
- Increase internal awareness of SEACOOS accomplishments and YR4 tasks
- Develop specific YR4 action plans
- Enumerate possible YR5 tasks
BY-PRODUCTS
- Determine the incremental contribution of SEACOOS to the coastal ocean observing systems of the Southeast, including data recovery
- Analyze the cross-Working Group integrative aspects of SEACOOS
- Convolve plans for SEACOOS testbeds with Application Themes
NOTE: WG = Working Group; AT = Application Theme
DAY ONE
- 0830
- General information on workshop organization, SEACOOS status and YR4 plans, etc. – Harvey Seim
- 0850
- Status of SECOORA/IOOS – Sandy Bernard
- 0900
- Inaugural Report on the Status of the Southeast Coastal Ocean, including discussion of options for the next report – Jim Nelson
- 0920
- Report on E& E activities and plans, including transition to SECOORA – Bob Bacon
- 0940
- Applying principles of “systems engineering”, a discussion of a document on this topic - Chris Mooers
- 1000
- Break
#Each of the below sub-regional sessions needs to cover common ground; e.g., status of observing system, modeling system, and information system; significant scientific and technical accomplishments; potential utilization of testbeds for thematic applications. (Each sub-regional session coordinator will be expected to provide the WGs and ATs with structured highlights in PowerPoint form in advance of the WS. These will be based upon common points to be addressed by speakers.)
- 1030
- #EFS (EFSIS, etc.; Chris Mooers, Coord.), Harvey Seim, Chair
- 1100
- GCB (SABSOON, etc.; Harvey Seim, Coord.), Bob Weisberg, Chair
- 1130
- #WFS (COMPS, etc.; Bob Weisberg, Coord.), Chris Mooers, Chair
- 1200
- Charge to WGs – Harvey Seim
- 1215
- Lunch
*Each of the below WG and AT sessions needs to analyze the next steps for SEACOOS , incorporating the sub-regional strengths. (Each WG and AT chair will be given a PowerPoint template to guide the preparation of their plenary summaries.)
- 1330
- *WGs meet to plan YR4 follow-ups and propose YR5 tasks
- 1500
- Break
- 1530
- WGs continue
- 1700
- Reception
DAY TWO
- 0830
- Charge to Application teams
-
Agenda for all AT breakouts:
-
Review/discuss revised white papers
-
Updates on applications
-
Develop short term action items, with specific elements per WG in year 4/5
-
Discuss incorporation of into revised implementation plan
- 0845
- *ATs meet to plan YR4 follow-ups and propose YR5 tasks
-
Ocean Circulation effect on Emergency Reponse - White Paper
-
Ocean Circulation effect on Marine Fisheries - White Paper
-
Surface Waves effect on Sediment Transport - White Paper
- 1000
- Break
- 1030
- ATs continue
- 1200
- Lunch
- 1330
- Plenary session for WGs & ATs to update their YR4 plans & outline their YR5 tasks
- 1500
- Break
- 1530
- Plenary session to outline priority, cross-cutting follow-ups for YR4 plans and proposed YR5 tasks in view of the previous plenary session: develop specific action plans
- 1700
- Adjourn
See who's coming to the workshop:
|
|